2012 Sixth IEEE/PES Transmission and Distribution: Latin America Conference and Exposition (T&D-La) 2012
DOI: 10.1109/tdc-la.2012.6319123
|View full text |Cite
|
Sign up to set email alerts
|

Substation power transformer risk management: Reflecting On reliability centered maintenance and monitoring

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
10
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 11 publications
(10 citation statements)
references
References 0 publications
0
10
0
Order By: Relevance
“…Then according to (6), its equivalent operation time after the mth maintenance and k th health state evaluation can be calculated by (7) where t m · k and t m · k refer to the equivalent operation time and the actual time after the mth maintenance and k th health state evaluation, respectively.…”
Section: Modifications On the Basic Fault Probability Model Considerimentioning
confidence: 99%
See 4 more Smart Citations
“…Then according to (6), its equivalent operation time after the mth maintenance and k th health state evaluation can be calculated by (7) where t m · k and t m · k refer to the equivalent operation time and the actual time after the mth maintenance and k th health state evaluation, respectively.…”
Section: Modifications On the Basic Fault Probability Model Considerimentioning
confidence: 99%
“…As for the influence of short-term sudden factors, (7) and (9) are synthesized to deduce its regression effect, shown as…”
Section: Modifications On the Basic Fault Probability Model Considerimentioning
confidence: 99%
See 3 more Smart Citations