All Days 2004
DOI: 10.4043/16561-ms
|View full text |Cite
|
Sign up to set email alerts
|

Subsea gas compression - A future option

Abstract: Ormen Lange is a long step-out gas field developed with gas processing facilities 120 km from the production wells. The development strategy is to deplete the reservoir. In order to maintain the production platau as long as possible and recover the anticipated gas and condensate resources, future compression is required for Ormen Lange.This paper describes the base case future compression alternative, the floating production platform.The paper also describes subsea gas compression as an alternative to the floa… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2005
2005
2018
2018

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Similarly, the technical gaps for power distribution is summarised in Table 3. [2]) and similar programmes are essential, where there are plans to bring the subsystems or complete systems ready for prototype testing. The challenge is to get the different systems ready to be put together in an integrated process under water.…”
Section: Technical Maturity and Qualificationmentioning
confidence: 99%
“…Similarly, the technical gaps for power distribution is summarised in Table 3. [2]) and similar programmes are essential, where there are plans to bring the subsystems or complete systems ready for prototype testing. The challenge is to get the different systems ready to be put together in an integrated process under water.…”
Section: Technical Maturity and Qualificationmentioning
confidence: 99%