2010
DOI: 10.1016/j.infsof.2009.11.003
|View full text |Cite
|
Sign up to set email alerts
|

Studying the impact of uncertainty in operational release planning – An integrated method and its initial evaluation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
18
0

Year Published

2010
2010
2023
2023

Publication Types

Select...
8
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 23 publications
(19 citation statements)
references
References 28 publications
(35 reference statements)
0
18
0
Order By: Relevance
“…Al-Emran [71] combines Monte-Carlo simulation with DES and models the release planning phase. Without presenting any details of the evaluation, they claimed that it was found useful for early risk detection and the development of mitigation strategies in the case study conducted at a company.…”
Section: Evaluation Of Usefulnessmentioning
confidence: 99%
“…Al-Emran [71] combines Monte-Carlo simulation with DES and models the release planning phase. Without presenting any details of the evaluation, they claimed that it was found useful for early risk detection and the development of mitigation strategies in the case study conducted at a company.…”
Section: Evaluation Of Usefulnessmentioning
confidence: 99%
“…System performance was concluded to be significantly affected by demand changes and supply uncertainties. Emran et al [30] examined the impact of uncertainty in operational release planning on total duration using Monte Carlo simulation. They concluded that every uncertain factor individually increases makespan; and for any combination of uncertainty factors, impact is bigger than the addition of their individual impacts.…”
Section: Current Methods To Tackle Uncertaintymentioning
confidence: 99%
“…This approach measured parameter sensitivity by perturbing variables upward or downward to try out various 'what-if' scenarios. Al-Emran et al [52], [53] performed probabilistic sensitivity analysis to evaluate the impact of uncertainties in operational release planning and product release planning in 2010. To avoid stochastic nature of the meta-heuristic algorithms, in 2014, Harman et al [4] applied a naive exact algorithm, a variant of the Nemhauser-Ullmann's algorithm [54], to study precise sensitivity analysis of NRP without considering requirements interaction.…”
Section: Uncertainty and Risk Handling In Requirements Engineeringmentioning
confidence: 99%