Proceedings of the 2015 International Conference on Economics, Social Science, Arts, Education and Management Engineering 2015
DOI: 10.2991/essaeme-15.2015.184
|View full text |Cite
|
Sign up to set email alerts
|

Study on trade-off of time-cost-quality in construction project based on BIM

Abstract: Abstract. With the development of BIM technology, BIM provides a new direction for the project management of three objectives. Based on the current situation of the project time cost-optimized mass balance studies, pointing out the implementation mechanism of achieving the trade-off of time-cost-quality in construction project based on BIM mainly oriented components of the BIM model based; the use of Structured Query Language query statistics data information needs combined bill of quantities calculation metho… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…Roofigari-Esfahan and Razavi built uncertainties upon the new concept of space-time float [85]. In [86], the uncertainty factors such as interest rates and prices are expressed by establishing quality, cost and schedule function. Abuwarda and Hegazy considered the uncertainty in geologic conditions as geologic parameters [58].…”
Section: Mathematic Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…Roofigari-Esfahan and Razavi built uncertainties upon the new concept of space-time float [85]. In [86], the uncertainty factors such as interest rates and prices are expressed by establishing quality, cost and schedule function. Abuwarda and Hegazy considered the uncertainty in geologic conditions as geologic parameters [58].…”
Section: Mathematic Modelmentioning
confidence: 99%
“…Mathematic model [82] duration and cost predetermined project scheduling GA [83] task duration predetermined project scheduling SBO [84] cost-time function predetermined project scheduling GA [85] space-time float predetermined optimize the duration LP [86] quality, cost and schedule function predetermined schedule cost optimization GA [87] weights between time, cost, quality and resources predetermined project Scheduling PSO [88] geometries of facilities predetermined facilities layout GA [89] resources uncertainties predetermined project Scheduling PSO Fuzzy theory [90] task duration, material supply predetermined material supply chain LP [91] work quantities, crews' productivities and costs predetermined project Scheduling GA [92] crew productivity predetermined project Scheduling GA [93] time and cost predetermined project Scheduling GA [94] human bias and uncertainty predetermined resource-allocation SBO [95] equipment failure rate predetermined project Scheduling DP-based GA [96] interaction cost and operating cost of facilities predetermined project Scheduling PSO [97] transportation cost of facilities predetermined project Scheduling DP-based PSO…”
Section: Dynamic Data Dynamic Data Resource Optimization Topic Algorithmmentioning
confidence: 99%