Study on the BL Early Warning Model of Transmission Line Tower Based on KNN-SVM Algorithm

Abstract: With the expansion of China’s power grid construction scale, the transmission line span are gradually improved, which also increases the risk of BL stroke on the transmission line. However, the traditional passive BL protection has many problems, such as weak pertinence and high investment cost, which can not meet the needs of social development. KNN can well describe the similarity measure between the two, which can effectively reduce the training samples. SVM can find the best compromise between model comple… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…In recent years, with the rapid development of China's economy and the continued increase of various social needs, China's manufacturing industry continues to prosper, and the country's electricity demand from the whole continues to increase, and the relevant configuration of the power grid is limited by the development of the local economic level [5]. Under normal circumstances, if the region's economy is developed and the manufacturing industry is more developed, then the demand for electricity in the region is bound to be huge, so the monitoring of the construction progress of the medium voltage overhead distribution network in the region is also very important, and the wiring of the medium voltage overhead distribution network in the region is also more complex compared to less developed regions [6].…”
Section: Introductionmentioning
confidence: 99%
“…In recent years, with the rapid development of China's economy and the continued increase of various social needs, China's manufacturing industry continues to prosper, and the country's electricity demand from the whole continues to increase, and the relevant configuration of the power grid is limited by the development of the local economic level [5]. Under normal circumstances, if the region's economy is developed and the manufacturing industry is more developed, then the demand for electricity in the region is bound to be huge, so the monitoring of the construction progress of the medium voltage overhead distribution network in the region is also very important, and the wiring of the medium voltage overhead distribution network in the region is also more complex compared to less developed regions [6].…”
Section: Introductionmentioning
confidence: 99%