2015
DOI: 10.1016/j.nucengdes.2015.05.018
|View full text |Cite
|
Sign up to set email alerts
|

Study on secondary shutdown systems in Tehran research reactor

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(1 citation statement)
references
References 8 publications
0
1
0
Order By: Relevance
“…But due to the lim ited re main ing op er at ing life en vis aged for TRR as an old re ac tor, de sign ing an SSS with min imum in ter fer ences and changes to the ex ist ing core struc ture is pre ferred. Very re cently, a study was under taken to com pare pos si ble meth ods for SSS which could be used in TRR [10]. Among them, use of heavy wa ter as re flec tor tank around the re ac tor core was selected as the op ti mum sys tem for TRR, but the study was lim ited to the first op er at ing core of TRR and the se lected method re quires ma jor changes to the ex ist ing core struc ture and grid plate that in the present work as a requirement we avoid it as much as possible.…”
Section: Introductionmentioning
confidence: 99%
“…But due to the lim ited re main ing op er at ing life en vis aged for TRR as an old re ac tor, de sign ing an SSS with min imum in ter fer ences and changes to the ex ist ing core struc ture is pre ferred. Very re cently, a study was under taken to com pare pos si ble meth ods for SSS which could be used in TRR [10]. Among them, use of heavy wa ter as re flec tor tank around the re ac tor core was selected as the op ti mum sys tem for TRR, but the study was lim ited to the first op er at ing core of TRR and the se lected method re quires ma jor changes to the ex ist ing core struc ture and grid plate that in the present work as a requirement we avoid it as much as possible.…”
Section: Introductionmentioning
confidence: 99%