Study on Operation Standard Time With Precast Members in Construction of High-Rise Rc Buildings Using High Strength Concrete

Abstract: A45 ・ story RC building , where pre ・ 。ast cencrete mernbers were ernployed for its outer 丘ame as well as inside colurnns and bearns , were constuCtion , and the estirnate equadon of the opcration standard time was examined with its construction data . As a resu 監 ち the f[) nowing conclusions were obta ed . 1) In this measuremen ち the installation time of the pre −cast member in the top f監 oor has decreased to 39 . 4-63 . 8% compared with that in the且oor . 2)In the construction of the high − rise RC building ,… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2007
2007
2007
2007

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 2 publications
0
0
0
Order By: Relevance