2022
DOI: 10.3390/app12062831
|View full text |Cite
|
Sign up to set email alerts
|

Study on Longitudinal Stress Relaxation Effect and Reinforcement Technology of Segment Lining during Shield Docking

Abstract: Shield docking technology is widely used in underwater shield tunnels. As the technology is not perfect, the instability of the tunnel face and the stress relaxation of segment lining caused by shield dismantling need to be solved. Using a cross-sea tunnel project, the segment lining reinforcement technology with steel channel in the process of shield docking is studied. The longitudinal stress relaxation effect of segment lining after thrust unloading is analyzed, and the theoretical solution of segment circu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 26 publications
(31 reference statements)
0
0
0
Order By: Relevance
“…In recent years, the slurry shield tunnelling method has been widely used in the construction of river-crossing tunnels and submarine tunnels under regions with complex hydrogeology [1][2][3]. Examples include the Tokyo Bay Tunnel [4], Nanjing Yangtze River Tunnel [3,5], Tuen Mun-Chek Lap Kok Tunnel [4,6] and other projects [7][8][9]. With the slurry shield method, slurry pressure is applied to effectively balance the stratum soil pressure and water pressure and maintain the stability of the excavation surface [10][11][12].…”
Section: Introductionmentioning
confidence: 99%
“…In recent years, the slurry shield tunnelling method has been widely used in the construction of river-crossing tunnels and submarine tunnels under regions with complex hydrogeology [1][2][3]. Examples include the Tokyo Bay Tunnel [4], Nanjing Yangtze River Tunnel [3,5], Tuen Mun-Chek Lap Kok Tunnel [4,6] and other projects [7][8][9]. With the slurry shield method, slurry pressure is applied to effectively balance the stratum soil pressure and water pressure and maintain the stability of the excavation surface [10][11][12].…”
Section: Introductionmentioning
confidence: 99%