Study on ground settlement and structural deformation for large span subway station using a new pre-supporting system

Abstract: This study presents a novel construction pre-supporting system for large underground space excavation with shallow depth, Steel Tube Slab system (STS), in which adjacent steel pipes are connected by a couple of flanges, bolts and concrete for flexural capacity and lateral stiffness of the whole structure. The STS method is employed for the first time for the construction of the ultra-shallow buried and large span subway station in China, during which ground settlement and structural deformation are monitored. … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
4
0

Year Published

2020
2020
2025
2025

Publication Types

Select...
9

Relationship

2
7

Authors

Journals

citations
Cited by 25 publications
(7 citation statements)
references
References 13 publications
0
4
0
Order By: Relevance
“…The method consists of jacking in steel pipes to form a pipe-roofing structure and then excavating under the support of the pipe-roofing structure. At present, many metro stations have adopted the pipe-roofing method, such as Xinle Site station of Shenyang Metro Line 2 [4], Dongbeidamalu station of Shenyang Metro Line 10, and Olympic Sports Centre Station on Line 9 [5][6][7]. Pipe jacking is one of the key stages of the pipe-roofing method [8][9][10] and is mainly divided into longitudinal pipe roof, which is jacked longitudinally along the station, and transverse pipe roof, which is jacked transversely along the station, according to the jacking direction.…”
Section: Introductionmentioning
confidence: 99%
“…The method consists of jacking in steel pipes to form a pipe-roofing structure and then excavating under the support of the pipe-roofing structure. At present, many metro stations have adopted the pipe-roofing method, such as Xinle Site station of Shenyang Metro Line 2 [4], Dongbeidamalu station of Shenyang Metro Line 10, and Olympic Sports Centre Station on Line 9 [5][6][7]. Pipe jacking is one of the key stages of the pipe-roofing method [8][9][10] and is mainly divided into longitudinal pipe roof, which is jacked longitudinally along the station, and transverse pipe roof, which is jacked transversely along the station, according to the jacking direction.…”
Section: Introductionmentioning
confidence: 99%
“…The previous studies conducted low-cyclic, reversed loading tests on composite shear walls with concealed bracings in steel-tube frames [34,35]. The software ABAQUS can simulate accurately various structural forms in the field of architecture, and is suitable for simulating experimental structural components and for obtaining accurate results [36][37][38][39][40][41]. The current study simulated low-cyclic, reversed loading tests conducted with four test pieces (from previous study [34,35]) and 24 additional virtual test pieces using ABAQUS.…”
Section: Introductionmentioning
confidence: 99%
“…Yang and Wang [22] analyzed the effect of metro tunnel excavation on the deformation of existing stations. Jia et al [23] studied the surface settlement and structural deformation of a new type of prebracing system for large-span subway stations. Zhang [24] carried out a study of shield tunneling through viaduct pile foundation underpinning.…”
Section: Introductionmentioning