2008 4th International Conference on Wireless Communications, Networking and Mobile Computing 2008
DOI: 10.1109/wicom.2008.2614
|View full text |Cite
|
Sign up to set email alerts
|

Study on Cost Forecast Method of Power Projects Based on Data Mining Technology

Abstract: Based on cost data of certain zone history power transmission line projects, applying data mining technology including relative analysis, clustering analysis and support vector machine theory, one kind of new cost forecast methods of power projects is presented. Firstly, applying relative analysis and partial correlation analysis in SPSS15.0 software package, cost forecast index system is built after simplifying technical conditions of power projects. Next, using, clustering analysis, noise information of cost… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2013
2013

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…SVM method is mostly used alone [10][11] , while a few may combine it with FIS (fuzzy inference system) [12] . Peng points out that SVM method has a significant advantage over other traditional methods in generalization ability and predict accuracy for small samples [13] .…”
Section: Summary Of Literature Reviewsmentioning
confidence: 99%
“…SVM method is mostly used alone [10][11] , while a few may combine it with FIS (fuzzy inference system) [12] . Peng points out that SVM method has a significant advantage over other traditional methods in generalization ability and predict accuracy for small samples [13] .…”
Section: Summary Of Literature Reviewsmentioning
confidence: 99%