2021
DOI: 10.1088/1755-1315/882/1/012028
|View full text |Cite
|
Sign up to set email alerts
|

Study on coal to methanol of Arutmin coal

Abstract: The Indonesian government has encouraged coal mining companies to expand into coal downstream industries. In response to this policy, PT. Arutmin Indonesia has conducted a pre-feasibility study on the construction of a coal-to-methanol plant. The plant was located in the Pulau Laut Utara Coal Terminal (NPLCT). The plant is designed to produce 3.0 million tons of methanol/year. The raw material is supplied from the Sarongga coal mine, about 5 km away from NPLCT. The coal-to-methanol process was simulated using … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 13 publications
0
0
0
Order By: Relevance