2020
DOI: 10.1016/j.procir.2020.05.018
|View full text |Cite
|
Sign up to set email alerts
|

Study of the impact of projection-based assistance systems for improving the learning curve in assembly processes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 12 publications
(7 citation statements)
references
References 13 publications
0
6
0
1
Order By: Relevance
“…The learning curve is also studied for determining input prices to monitor technical changes in the energy transfer process (Zhou et al , 2019), economic scenario planning (Ramirez et al , 2020). Besides, the learning curve is used for the reduction of labour cost and product assembly (Ören and Erol, 2009), product assembly (Mark et al , 2020), analysis of the impact of renewable energy systems (Hong et al , 2020), virtual lab experiments (Francis et al , 2016) and cost/time optimization problems (Abdelkhalek et al , 2020).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The learning curve is also studied for determining input prices to monitor technical changes in the energy transfer process (Zhou et al , 2019), economic scenario planning (Ramirez et al , 2020). Besides, the learning curve is used for the reduction of labour cost and product assembly (Ören and Erol, 2009), product assembly (Mark et al , 2020), analysis of the impact of renewable energy systems (Hong et al , 2020), virtual lab experiments (Francis et al , 2016) and cost/time optimization problems (Abdelkhalek et al , 2020).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Transforaminal perkütan endoskopik lombar diskektomide belirli tekrar sonrasında öğrenme kararlı bir düzeye ulaşır [66]. Ayrıca öğrenme eğrisi, enerji transfer sürecinde teknik değişimlerin izlenmesi için girdi fiyatların belirlenmesinde [67], ekonomik senaryo planlamada [68], iş gücü maliyetinin azaltılmasında [69], uçak gövde maliyetinin belirlenmesinde [70], ürün montajında [71], yenilebilir enerji sistemlerinin şebeke üzerindeki etkisinin analizinde [72], sanal laboratuvar deneylerinde [73] ve maliyet/zaman optimizasyon problemlerinde [74] kullanılmıştır.…”
Section: Li̇teratür Araştirmasiunclassified
“…Projection-Based Assistance System: A projection-based assistance system is a system, which projects information, e.g. instructions, directly on the operator's field of vision on the workplace (Mark et al 2020b). They can be flexibly designed in order to be moved to any workplace (Hinrichsen et al 2018).…”
Section: Cognitive Worker Assistance Systemsmentioning
confidence: 99%