2019
DOI: 10.1016/j.fusengdes.2019.02.139
|View full text |Cite
|
Sign up to set email alerts
|

Structural verification and manufacturing procedures of the cooling system, for DEMO divertor target (OVT)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
6

Relationship

3
3

Authors

Journals

citations
Cited by 6 publications
(10 citation statements)
references
References 8 publications
(8 reference statements)
0
10
0
Order By: Relevance
“…In 2020, after the partial upgrade of the experimental hall at ENEA Brasimone laboratories, the complete design and realization of a new test section data and acquisition system and the installation of the OVT mock-up, the experimental test campaign was started by means of the CEF1 water loop, according to the test matrix drafted in [6]. The CEF1 water loop consists of a heat exchanger and two centrifugal pumps, which can be operated in series or in parallel, the test section, and the return line to the pressurized tank [6], as shown in Figure 2.…”
Section: Experimental Test Campaignmentioning
confidence: 99%
See 3 more Smart Citations
“…In 2020, after the partial upgrade of the experimental hall at ENEA Brasimone laboratories, the complete design and realization of a new test section data and acquisition system and the installation of the OVT mock-up, the experimental test campaign was started by means of the CEF1 water loop, according to the test matrix drafted in [6]. The CEF1 water loop consists of a heat exchanger and two centrifugal pumps, which can be operated in series or in parallel, the test section, and the return line to the pressurized tank [6], as shown in Figure 2.…”
Section: Experimental Test Campaignmentioning
confidence: 99%
“…In 2020, after the partial upgrade of the experimental hall at ENEA Brasimone laboratories, the complete design and realization of a new test section data and acquisition system and the installation of the OVT mock-up, the experimental test campaign was started by means of the CEF1 water loop, according to the test matrix drafted in [6]. The CEF1 water loop consists of a heat exchanger and two centrifugal pumps, which can be operated in series or in parallel, the test section, and the return line to the pressurized tank [6], as shown in Figure 2. The OVT mock-up main components are the plasma facing channels, consisting of 39 tubes in CuCrZr equipped with internal helical swirl tape made of copper, the inlet/outlet manifolds made of AISI-316L steel, the inlet diffuser made of AISI-316L, the outlet header made of AISI-316L, the transition CuCrZr/AISI-316L tubes, i.e., the connection between the CuCrZr plasma facing tubes and AISI-316L manifolds/diffuser, and the supporting system [6].…”
Section: Experimental Test Campaignmentioning
confidence: 99%
See 2 more Smart Citations
“…-Maximum water velocity in PFC tubes < 16m/s -CHF margin > 1.4; -Maximum pressure drop < 1.4 MPa; A physical mock-up of the OVT for the verification of the thermo-hydraulic performances has been designed [25] and it is currently under testing.…”
Section: Thermo-hydraulic Analysismentioning
confidence: 99%