1989
DOI: 10.1109/32.21762
|View full text |Cite
|
Sign up to set email alerts
|

Structural approach to the estimation of the number of residual software faults based on the hyper-geometric distribution

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
37
0

Year Published

1991
1991
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 104 publications
(38 citation statements)
references
References 8 publications
0
37
0
Order By: Relevance
“…The study discussed Naïve Bayes (NB) classifier, Decision Tree (DT) classifier and Artificial Neural Networks (ANNs) classifier. The discussed ML classifiers are applied to three different datasets obtained from [1] and [2] works.…”
Section: Introductionmentioning
confidence: 99%
“…The study discussed Naïve Bayes (NB) classifier, Decision Tree (DT) classifier and Artificial Neural Networks (ANNs) classifier. The discussed ML classifiers are applied to three different datasets obtained from [1] and [2] works.…”
Section: Introductionmentioning
confidence: 99%
“…1 2 75 24 2 8 2 0 31 25 1 15 3 30 63 26 7 31 4 13 128 27 0 1 5 13 122 28 22 57 6 3 27 29 2 27 7 17 136 30 5 35 8 2 49 310 5 10 15 20 25 30 35 40 45 A Test/Debug data set has 46 measurements is given in Table III. The data set was presented in [37]. The number of measurements collected during the testing process is small.…”
Section: Test/debug Datamentioning
confidence: 99%
“…Field report data was developed to measure system faults during testing in a real-time application [37]. The software system consists of 200 modules with each having one kilo line of code of FORTRAN.…”
Section: Test/debug Datamentioning
confidence: 99%
“…In the second case study, a real-time application [56] of a software system containing 200 modules of FORTRAN language was used to test our proposed methodology. The data consists of 111 measurements [55].…”
Section: B Test/debug Datamentioning
confidence: 99%
“…In our third case study, we used a Test/Debug data set including 46 measurements as presented in [56]. We ran the GWO to find the best parameters to tune the EXPM, POWM and DSSM.…”
Section: Test/debug Datamentioning
confidence: 99%