String Test Preparation for the Superconducting SIS100 Accelerator of FAIR

Abstract: GSI plans to build a test string in the Series Test Facility (STF) for SIS100 at GSI. The SIS100 cryomagnetic modules and local cryocomponents will be assembled and intensively tested. The purpose of the string test is to confirm technical systems of cryogenic, vacuum, interlock and quench protection, and powering under normal and extreme conditions. Acquirement of knowledge through experiences in test string construction, commissioning, and testing is crucial for the SIS100 construction and operation. We pres… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2014
2014
2018
2018

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…At the beginning of the SIS100 series dipole testing all four benches will be used for the tests of the dipole magnets. When the first of series quadrupole doublet will be delivered to GSI one of the test benches will be used to operate the string test [8].…”
Section: Gsi Test Facility For Sis100 Series Dipolementioning
confidence: 99%
“…At the beginning of the SIS100 series dipole testing all four benches will be used for the tests of the dipole magnets. When the first of series quadrupole doublet will be delivered to GSI one of the test benches will be used to operate the string test [8].…”
Section: Gsi Test Facility For Sis100 Series Dipolementioning
confidence: 99%
“…When the first of series quadrupole doublet will be delivered to GSI one of the test benches will be used to operate the string test [3].…”
Section: Series Test Facility Activitiesmentioning
confidence: 99%