Abstract:Abstract. Steel bridge was responsible for the connection of wharf and barge, when large structure was shift by Platform lorry. The enough strength of steel bridge was required for the safety of the shipment since the larger mass of steel structure, and the platform lorry walking and stopping on a steel bridge. This article was based on the actual operating conditions in the shipment process of large steel structure, used surface-surface contact elements between wharf and steel trestle in finite element modeli… Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.