All Days 2013
DOI: 10.2118/167274-ms
|View full text |Cite
|
Sign up to set email alerts
|

Strategies for Improving Sweep Efficiency and Waterflood Recovery in a Complex Reservoir in the Greater Burgan Field; Learning from a Pilot Water Injection Project and Evaluation Using Sector Model Simulation

Abstract: The Greater Burgan Field, operated by Kuwait Oil Company (KOC), is the largest clastic and overall the second largest oilfield in the world. First discovered in 1938, with production from 1946, production to date has relied on primary recovery methods. In recent years secondary and enhanced recovery techniques have been investigated with water flood now at an advanced state of implementation. The first such water flood project is in the Upper Cretaceous (Cenomanian) Wara Formation, one of the main producing re… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 4 publications
(1 reference statement)
0
1
0
Order By: Relevance
“…Several techniques are used to create a proper approximation of the shared boundary conditions. A widespread procedure is to select the sectors with an irrelevant or even no flux contour and implement a Dirichlet Boundary condition with fixed flux equal to 0 or another constant [1,5,14,16,20,23]. This type of solution is applied to reservoirs with low interaction among wells, when operational changes do not significantly impact the track of streamlines or when the objective is only to simulate a short period of time [2,15].…”
Section: Introductionmentioning
confidence: 99%
“…Several techniques are used to create a proper approximation of the shared boundary conditions. A widespread procedure is to select the sectors with an irrelevant or even no flux contour and implement a Dirichlet Boundary condition with fixed flux equal to 0 or another constant [1,5,14,16,20,23]. This type of solution is applied to reservoirs with low interaction among wells, when operational changes do not significantly impact the track of streamlines or when the objective is only to simulate a short period of time [2,15].…”
Section: Introductionmentioning
confidence: 99%