2009 IEEE Electrical Power &Amp; Energy Conference (EPEC) 2009
DOI: 10.1109/epec.2009.5420928
|View full text |Cite
|
Sign up to set email alerts
|

Strategic maintenance scheduling of distributed generations in oligopolistic electricity markets

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2012
2012
2012
2012

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 11 publications
0
2
0
Order By: Relevance
“…Continuity between the time periods of maintenance is necessary; therefore, the operator adds this feature to the optimization problem when it considers constraint (4). Constraint (5) shows that a unit which is in maintenance cannot be committed.…”
Section: Problem Formulation and Methodologymentioning
confidence: 99%
See 1 more Smart Citation
“…Continuity between the time periods of maintenance is necessary; therefore, the operator adds this feature to the optimization problem when it considers constraint (4). Constraint (5) shows that a unit which is in maintenance cannot be committed.…”
Section: Problem Formulation and Methodologymentioning
confidence: 99%
“…A method based on game theory for maintenance scheduling in the layer of producers and in the transmission level is introduced in [4]. In this model producers decide their outage plans, considering their rivals' reactions.…”
Section: Introductionmentioning
confidence: 99%