2018
DOI: 10.48550/arxiv.1805.02525
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

Storage Scheduling with Stochastic Uncertainties: Feasibility and Cost of Imbalances

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

1
7
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(8 citation statements)
references
References 15 publications
1
7
0
Order By: Relevance
“…3 In contrast, we consider that the SOC of the v-th PEV at k a v is uncertain and we describe it using a random variable E v (k a v ), with realization e v (k a v ). From (6), it follows that both uncertainties, i.e. P(k) and E v (k a v ), affect the SOC of the "time varying-battery", which is therefore a random variable itself: E(k) with realization e(k).…”
Section: Three-stage Scheduling and Operationmentioning
confidence: 99%
See 4 more Smart Citations
“…3 In contrast, we consider that the SOC of the v-th PEV at k a v is uncertain and we describe it using a random variable E v (k a v ), with realization e v (k a v ). From (6), it follows that both uncertainties, i.e. P(k) and E v (k a v ), affect the SOC of the "time varying-battery", which is therefore a random variable itself: E(k) with realization e(k).…”
Section: Three-stage Scheduling and Operationmentioning
confidence: 99%
“…P(k) and E v (k a v ), affect the SOC of the "time varying-battery", which is therefore a random variable itself: E(k) with realization e(k). We describe the dynamics of E(k) using a stochastic model similar to the one in [6], where the conversion losses of the "time-varying battery" are approximated to their expected value. However, such a model is extended in the following to include the additional uncertainty E v (k a v ).…”
Section: Three-stage Scheduling and Operationmentioning
confidence: 99%
See 3 more Smart Citations