2007 IEEE Particle Accelerator Conference (PAC) 2007
DOI: 10.1109/pac.2007.4440299
|View full text |Cite
|
Sign up to set email alerts
|

Status of the spallation neutron source superconducting RF facilities

Abstract: The Spallation Neutron Source (SNS) project was completed with only limited superconducting RF (SRF) facilities installed as part of the project. A concerted effort has been initiated to install the infrastructure and equipment necessary to maintain and repair the superconducting Linac, and to support power upgrade research and development (R&D). Installation of a Class10/100/10,000 cleanroom and outfitting of the test cave with RF, vacuum, controls, personnel protection and cryogenics systems is underway. A h… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2007
2007
2008
2008

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…This includes a clean room for cavity and cryomodule handling and assembly; a test cave for testing full cryomodules and for a single-cavity horizontal cryostat, used for cavity qualification [4].…”
Section: Future Plansmentioning
confidence: 99%
“…This includes a clean room for cavity and cryomodule handling and assembly; a test cave for testing full cryomodules and for a single-cavity horizontal cryostat, used for cavity qualification [4].…”
Section: Future Plansmentioning
confidence: 99%