Proceedings of the 10th Int. Particle Accelerator Conf. 2019
DOI: 10.18429/jacow-ipac2019-mopts020
|View full text |Cite
|
Sign up to set email alerts
|

Status of the FAIR Proton LINAC

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…Secondary beams of rare isotopes and exotic nuclei, will be separated by the Superconducting FRagment Separator (Super-FRS) [9] to serve branches for different experimental areas and also for storage rings, while the antiproton separator selects and steers antiprotons to the collector ring (CR), with the main tasks their collection and cooling to inject the high-energy storage ring (HESR) for accumulation and cooling to provide high-intensity beams for in-ring experiments. Concerning the antiproton beams production, a new linear accelerator, the proton linac [10,11] (pLinac) will be installed for high-intensity injection into the SIS18/SIS100 synchrotron chain. Both, the proton linac and also the CRYRING [12] which is already installed at GSI, while located on the existing GSI site, are part of the FAIR complex.…”
Section: Jinst 15 C10001mentioning
confidence: 99%
“…Secondary beams of rare isotopes and exotic nuclei, will be separated by the Superconducting FRagment Separator (Super-FRS) [9] to serve branches for different experimental areas and also for storage rings, while the antiproton separator selects and steers antiprotons to the collector ring (CR), with the main tasks their collection and cooling to inject the high-energy storage ring (HESR) for accumulation and cooling to provide high-intensity beams for in-ring experiments. Concerning the antiproton beams production, a new linear accelerator, the proton linac [10,11] (pLinac) will be installed for high-intensity injection into the SIS18/SIS100 synchrotron chain. Both, the proton linac and also the CRYRING [12] which is already installed at GSI, while located on the existing GSI site, are part of the FAIR complex.…”
Section: Jinst 15 C10001mentioning
confidence: 99%