Statoil North Sea – Successful World Record MLT Installation

Abstract: In October 2010 the deepest set sealed multilateral junction in the industry was installed at 6900 m MD in Oseberg South well 30/9-F-9 AY1/Y2. The differential pressure across the junction in the well is expected to be in the range of 250 bars. To meet this pressure requirement, a multilateral (ML) junction rated to 370 bars was identified. The high pressure junction components and entire multilateral system has undergone an extensive testing and qualification program, including several componen… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2016
2016

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…3) and is used to anchor the whipstock (see Fig. 4) and completion deflector (Eck-Olsen et al 2011). The latch coupling (see Fig.…”
Section: System Design For This Projectmentioning
confidence: 99%
“…3) and is used to anchor the whipstock (see Fig. 4) and completion deflector (Eck-Olsen et al 2011). The latch coupling (see Fig.…”
Section: System Design For This Projectmentioning
confidence: 99%