Stationary and mobile storages-based renewable off-grid system planning considering storage degradation cost based on information-gap decision theory optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
14
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
10

Relationship

1
9

Authors

Journals

citations
Cited by 70 publications
(14 citation statements)
references
References 46 publications
0
14
0
Order By: Relevance
“…To elaborate, the suggested DRP model can displace the demand during the off-peak period as per the price of electricity in the day-ahead market, as given by Equations ( 19) and ( 20) and the objective function (1). The limitations applied to the ESS are presented in Equations ( 21)- (25), showing the charge and discharge limits ( 21) and ( 22) [55][56], energy storage in the ESS (23), the initial energy of the ESS (24) and the energy limit, (25) [57]. Additionally, the VPP power limit is shown by Equations ( 26) and (27), where constraint (26) expresses the maximum active power output of the VPP.…”
Section: Vpp Constraintsmentioning
confidence: 99%
“…To elaborate, the suggested DRP model can displace the demand during the off-peak period as per the price of electricity in the day-ahead market, as given by Equations ( 19) and ( 20) and the objective function (1). The limitations applied to the ESS are presented in Equations ( 21)- (25), showing the charge and discharge limits ( 21) and ( 22) [55][56], energy storage in the ESS (23), the initial energy of the ESS (24) and the energy limit, (25) [57]. Additionally, the VPP power limit is shown by Equations ( 26) and (27), where constraint (26) expresses the maximum active power output of the VPP.…”
Section: Vpp Constraintsmentioning
confidence: 99%
“…The allowed voltage magnitude is in the range [0.95-1.05] p.u. [72][73][74][75][76][77][78][79][80]. The characteristics of its transmission lines are presented in [67], where the resistance of each transmission line is 10% of its reactance.…”
Section: Datamentioning
confidence: 99%
“…[117] provides the detailed information on the given test system, including the place and capacity of distribution lines, substations, and peak load. Once can achieve the daily load profile by multiplying the peak load and the daily load factor curve [125][126][127][128][129][130][131] as shown in Figure 2 [1]. There are six IBVPP in the system.…”
Section: Problem Datamentioning
confidence: 99%