2015
DOI: 10.1177/1687814015606301
|View full text |Cite
|
Sign up to set email alerts
|

Static scheduling in consideration of resource categories in collaborative product development project

Abstract: In collaborative product development project plan phase, a reasonable allocation plan can shorten project duration. Static scheduling is a useful way to obtain the allocation result. Matching degree and resource categories are introduced into the standard model of multi-mode resource-constrained project scheduling problem to reflect the resource characteristics including three aspects: (1) human resource is different from technology resource, (2) different technology resources will influence project duration, … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 13 publications
(18 reference statements)
0
1
0
Order By: Relevance
“…Based on agent simulation, Zhang and Li [16] simulated the human working behaviours in a collaborative product development process, where the design agent selected her/his partner according to the ability and character matching degree. Furthermore, Li and Zhang [17] analysed the static single category resource scheduling problem and the multi-category resource static scheduling problem. Based on ontology and service capabilities, He and Hu [18] proposed matching rules and algorithms of manufacturing tasks and services.…”
Section: Introductionmentioning
confidence: 99%
“…Based on agent simulation, Zhang and Li [16] simulated the human working behaviours in a collaborative product development process, where the design agent selected her/his partner according to the ability and character matching degree. Furthermore, Li and Zhang [17] analysed the static single category resource scheduling problem and the multi-category resource static scheduling problem. Based on ontology and service capabilities, He and Hu [18] proposed matching rules and algorithms of manufacturing tasks and services.…”
Section: Introductionmentioning
confidence: 99%