Proceedings of the 25th International Symposium on Advancement of Construction Management and Real Estate 2021
DOI: 10.1007/978-981-16-3587-8_6
|View full text |Cite
|
Sign up to set email alerts
|

State-of-the-Art of BIM-Based LCA in the Building Sector

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 54 publications
0
1
0
Order By: Relevance
“…Case studies and LCA frameworks (that could be operationalised) were separated for detailed analysis, numbering 42 documents in total [1, 2, . The remaining 24 documents [5,13,15,19,21,[62][63][64][65][66][67][68][69][70][71][72][73][74][75][76][77][78][79][80] were included in the literature review, in addition to 12 academic articles, industry documents and reports [9,[16][17][18][81][82][83][84][85][86][87][88] that were selected using a backward and forward snowball approach (papers from the reference list, and papers that cited articles in the review). This technique was used when there were perceived information gaps.…”
Section: Methodsmentioning
confidence: 99%
“…Case studies and LCA frameworks (that could be operationalised) were separated for detailed analysis, numbering 42 documents in total [1, 2, . The remaining 24 documents [5,13,15,19,21,[62][63][64][65][66][67][68][69][70][71][72][73][74][75][76][77][78][79][80] were included in the literature review, in addition to 12 academic articles, industry documents and reports [9,[16][17][18][81][82][83][84][85][86][87][88] that were selected using a backward and forward snowball approach (papers from the reference list, and papers that cited articles in the review). This technique was used when there were perceived information gaps.…”
Section: Methodsmentioning
confidence: 99%