2018
DOI: 10.28991/cej-03091140
|View full text |Cite
|
Sign up to set email alerts
|

Stakeholders’ Perception on Critical Cost Variation Factors in Malaysian Building Projects

Abstract: Effective cost management is one of the prime requirements for successful completion of construction projects. However, deviation from initially planned cost had been prevalent in construction projects. Cost variation has become a frequent phenomenon in construction projects and Malaysian building projects has no exclusion. This paper aims to establish the critical factors instigating cost variation in Malaysian building projects. Extensive literature review and field survey were two main methods for conductin… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
11
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(11 citation statements)
references
References 13 publications
0
11
0
Order By: Relevance
“…The cost overrun causes previously identified in Table 1 have been analyzed to rank the top five cost overrun causes based on the number of studies that cited these factors as the critical factors that lead to cost overrun. [40], [15], [41], [42], [43], [44], [45], [46], [47], [48], [49], [50], [51], [52], [53], [20], [54], [14], [55], [56], , [57], [58], [59], [60], [59], [61], [25] [62], [10], [63], [64], [65], [65], [66], [67], [11], [12], [68], [69], [70], [71], [72] [41], [15], [78], [79], [80], [81], [44], [47], [48],…”
Section: Rank the Top Five Critical Cost Overrun Causesmentioning
confidence: 99%
See 2 more Smart Citations
“…The cost overrun causes previously identified in Table 1 have been analyzed to rank the top five cost overrun causes based on the number of studies that cited these factors as the critical factors that lead to cost overrun. [40], [15], [41], [42], [43], [44], [45], [46], [47], [48], [49], [50], [51], [52], [53], [20], [54], [14], [55], [56], , [57], [58], [59], [60], [59], [61], [25] [62], [10], [63], [64], [65], [65], [66], [67], [11], [12], [68], [69], [70], [71], [72] [41], [15], [78], [79], [80], [81], [44], [47], [48],…”
Section: Rank the Top Five Critical Cost Overrun Causesmentioning
confidence: 99%
“…Poor cost control during construction [94], [80], [78], [46], [47], [48], [82], [95], [55], [83], [57], [96], [60], [20], [57], [86], [97], [98], [99], [65], [11], [89], [100], [90], [72], [93], [74], [76] 37 4 Poor owners' financial status which leads to delay due payments [41], [102], [80], [42], [46], [47], [45], [103], [82], [50], [52],…”
Section: Rank the Top Five Critical Cost Overrun Causesmentioning
confidence: 99%
See 1 more Smart Citation
“…Regrettably, Malaysia's construction industry showing low performance to encounter the cost overrun where the average overrun is 5-10% of the initial price. On the other hand, 53.2% of the public sector and 62.8% of private-sector construction projects are over-budgeted (Abdul Rahman et al, 2012;Endut et al, 2009;Sohu et al, 2018). Even in Malaysia, construction projects are facing cost overrun and machinery rates are considered as one of the critical factors .…”
Section: Introductionmentioning
confidence: 99%
“…Construction industry plays a major role in enhancing socio-economic development of a county since it contributes to Gross Domestic Product (GDP)and generates greateremployment opportunities [1][2][3][4]. For a vibrant construction industry, successful completion of construction projects is vital.…”
Section: Introductionmentioning
confidence: 99%