2023
DOI: 10.3389/feart.2023.1181949
|View full text |Cite
|
Sign up to set email alerts
|

Stability analysis of rock slope under Sujiaba overpass in Chongqing City based on kinematic and numeric methods

Abstract: Rock slopes have the characteristics of complex geological conditions, weak structural surface development, steep slope, and great damage. In this study, the Sujiaba overpass slope in Chongqing was selected as the evaluation object, and the main stability evaluation methods of rock slope were analyzed. Combined with the special geological conditions and geographical location of the rock slope, through a geological survey, the slope was qualitatively analyzed based on the stereographic projection method, and th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 45 publications
0
1
0
Order By: Relevance
“…Based on the above comprehensive analysis, there is a great possibility of sliding and shearing out of the unstable slope under rainstorm or continuous rainfall. Therefore, the study suggests setting up retaining engineering at the front edge of the unstable slope adjacent to the sandstone cliff by using a pile-anchor system for retaining [42,43], and combining the actual situation with surface water interception and drainage measures and displacement monitoring.…”
Section: Engineering Scheme Suggestionsmentioning
confidence: 99%
“…Based on the above comprehensive analysis, there is a great possibility of sliding and shearing out of the unstable slope under rainstorm or continuous rainfall. Therefore, the study suggests setting up retaining engineering at the front edge of the unstable slope adjacent to the sandstone cliff by using a pile-anchor system for retaining [42,43], and combining the actual situation with surface water interception and drainage measures and displacement monitoring.…”
Section: Engineering Scheme Suggestionsmentioning
confidence: 99%