2016
DOI: 10.1139/cgj-2015-0456
|View full text |Cite
|
Sign up to set email alerts
|

Stability analyses for deviated wellbores in unconsolidated cross-anisotropic formations

Abstract: Production of oil from shallow reservoirs typically involves drilling highly deviated wells through unconsolidated (or poorly lithified) rocks or clays. This paper describes numerical analyses of the deformations and stability of deviated wellbores within a K0-consolidated clay. The analyses consider planar deformations in the plane orthogonal to the wellbore using a quasi three-dimensional (3D) finite element model that represents coupled flow and deformations within the soil mass. Cross-anisotropic mechanica… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 14 publications
0
0
0
Order By: Relevance
“…In drilling projects, unconsolidated formations like the sand layer, gravel bed, and cobbles formation are regarded as one of the most complex and challenging formations to deal with [1][2][3], since it is prone to causing drilling accidents such as drilling tools sticking, drilling tools burying, and borehole collapse. Once drilling tools are stuck or buried in unconsolidated formations, retrieving them from boreholes is almost impossible, which will incur additional time and cost consumption [4][5][6].…”
Section: Introductionmentioning
confidence: 99%
“…In drilling projects, unconsolidated formations like the sand layer, gravel bed, and cobbles formation are regarded as one of the most complex and challenging formations to deal with [1][2][3], since it is prone to causing drilling accidents such as drilling tools sticking, drilling tools burying, and borehole collapse. Once drilling tools are stuck or buried in unconsolidated formations, retrieving them from boreholes is almost impossible, which will incur additional time and cost consumption [4][5][6].…”
Section: Introductionmentioning
confidence: 99%