1994
DOI: 10.2172/10114576
|View full text |Cite
|
Sign up to set email alerts
|

Spent nuclear fuels project characterization data quality objectives strategy

Abstract: Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
15
0

Year Published

1995
1995
2007
2007

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 9 publications
(15 citation statements)
references
References 2 publications
0
15
0
Order By: Relevance
“…Past characterization campaigns for both fuel and sludge from K Basins have been governed by formal DQOs (e.g., Makenas 1998Makenas , 1999Makenas , and 2000. Methodology in the K Basin Project DQO Strategy Document (Lawrence 1994), used to select objectives for the present testing, is based on EPA guidance (EPA 1994) but modified for a project, such as K Basin Closure (KBC), seeking to determine bounding conditions to pick design, transportation, and mitigation alternatives. Therefore, the issues were limited to those raised by the independent review panel (Heywood 2006) pertaining to the oxidation process.…”
Section: Introductionmentioning
confidence: 99%
“…Past characterization campaigns for both fuel and sludge from K Basins have been governed by formal DQOs (e.g., Makenas 1998Makenas , 1999Makenas , and 2000. Methodology in the K Basin Project DQO Strategy Document (Lawrence 1994), used to select objectives for the present testing, is based on EPA guidance (EPA 1994) but modified for a project, such as K Basin Closure (KBC), seeking to determine bounding conditions to pick design, transportation, and mitigation alternatives. Therefore, the issues were limited to those raised by the independent review panel (Heywood 2006) pertaining to the oxidation process.…”
Section: Introductionmentioning
confidence: 99%
“…Detailed characterization plans will be structured using the Data Quality Objective (DQO) process to support Path Forward project decisions (Lawrence et al 1994). …”
Section: Scopementioning
confidence: 99%
“…All SNF Project characterization sampling campaigns will be planned using the modified DQO process called out in SNF Project Characterization Data Quality Objectives Strategy (Lawrence et al 1994). The results of the DQO process will be documented, issued, and controlled as an…”
Section: Hnf-sd-snf-pln-010 Revmentioning
confidence: 99%
See 2 more Smart Citations