Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Process Flow Diagram Mass Balance Calculations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2000
2000
2003
2003

Publication Types

Select...
2

Relationship

2
0

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…The ten to one dilution assures safe dilution of up to 8 percent hydrogen to less than 25 percent of the lower flammability limit in air based on theoretical amount of hydrogen from sampling a "best estimate" for a single scrap basket MCO after two years of interim storage. This "best estimate" single scrap basket MCO is the baseline MCO in the CSB process flow diagram by Klem and Pajunen (2000). Duncan (2001) shows that expected hydrogen concentrations for this case are 6.0 percent at zero year and 8.0 percent at two year storage time intervals.…”
Section: Exhaust Gas Dilutionmentioning
confidence: 89%
“…The ten to one dilution assures safe dilution of up to 8 percent hydrogen to less than 25 percent of the lower flammability limit in air based on theoretical amount of hydrogen from sampling a "best estimate" for a single scrap basket MCO after two years of interim storage. This "best estimate" single scrap basket MCO is the baseline MCO in the CSB process flow diagram by Klem and Pajunen (2000). Duncan (2001) shows that expected hydrogen concentrations for this case are 6.0 percent at zero year and 8.0 percent at two year storage time intervals.…”
Section: Exhaust Gas Dilutionmentioning
confidence: 89%
“…A magnetically coupled low-pressure readout unit is later installed on the exterior surface ofport number 1 blind cover plate of the K East Basin monitored MCOs. The weight of the lowpressure readout unit is based on Klem and Pajunen (2000).…”
Section: Me-9 Low-pressure Readout Units For K East Basin Monitored Mcosmentioning
confidence: 99%
“…The original blind cover plates are reinstalled on the 199 MCOs that contain high-pressure sending units and a redesigned blind cover plate (Stream MW-8) is installed on the four monitored MCOs. Weight of the sending units is based on Klem and Pajunen (2000). Klem and Pajunen (2000).…”
Section: Mw-3 Port Number 2 and 4 Blind Cover Plates Seals And Boltsmentioning