2012
DOI: 10.1007/978-3-642-34050-5_39
|View full text |Cite
|
Sign up to set email alerts
|

Some Specific Activities at the Railway Signalling System Development

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2013
2013
2019
2019

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 2 publications
0
4
0
Order By: Relevance
“…In this case we have to assume more pessimistic approach of evaluation, and dangerous failure rate is therefore assumed as a sum of separately determined dangerous failure rate of each realised SF. This issue is described in [5].…”
Section: A Centralised Architecture Of Srcsmentioning
confidence: 99%
See 3 more Smart Citations
“…In this case we have to assume more pessimistic approach of evaluation, and dangerous failure rate is therefore assumed as a sum of separately determined dangerous failure rate of each realised SF. This issue is described in [5].…”
Section: A Centralised Architecture Of Srcsmentioning
confidence: 99%
“…More safety functions can be realised by this SRCS. When we assume, that dangerous failure of any element which cooperates on realisation of safety function will cause dangerous failure of SF (we can assume serial model of system elements), then dangerous failure rate can be express using equation: , (5) where is dangerous failure rate of element i which cooperate on SF realisation and n is count of elements which realises SF. When SRCS is realising multiple SF, it is obvious that some elements (such as control logic) will be used to realize more than one SF.…”
Section: A Centralised Architecture Of Srcsmentioning
confidence: 99%
See 2 more Smart Citations