2013
DOI: 10.2478/mms-2013-0029
|View full text |Cite
|
Sign up to set email alerts
|

Some Practical Problems of Communications Reliability in Enviromental Monitoring Systems

Abstract: In this paper, some issues of building a reliable, distributed measurement system for monitoring of water quality in reservoir Lake Dobczyckie are presented. The system is based on a measurement station that has the shape of a floating buoy which is supposed to be at anchor on the reservoir. Wireless data transmission problems that were encountered during the development of the buoy, modeling a radio link, and measurements of actual signal strength on the reservoir are discussed. A mathematical approach to pro… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
5

Relationship

2
3

Authors

Journals

citations
Cited by 6 publications
(7 citation statements)
references
References 14 publications
0
7
0
Order By: Relevance
“…The communication between the node and the network hub has been verified. This communication structure has already been successfully used by us in a system for water quality monitoring [25]. The maximum communication span was 65 m in free space and 45 m inside the building.…”
Section: Half-bridge1mentioning
confidence: 99%
“…The communication between the node and the network hub has been verified. This communication structure has already been successfully used by us in a system for water quality monitoring [25]. The maximum communication span was 65 m in free space and 45 m inside the building.…”
Section: Half-bridge1mentioning
confidence: 99%
“…The crucial step in the PV Optimizer design procedure is the identification of electronic components able not only to assure its feasibility in terms of current and voltage rates, but also to assure its high performance in the presence of temperature variations causing a change of their properties. So, an electronic-thermal design method [8][9][10][11] becomes a necessary approach in the development of DMPPT converters to ensure fulfilling by the power devices the electrical and thermal requirements which strongly influence the energetic, efficiency and reliability performance of the complete PV Optimizers. Many methods are available to reach this purpose, such as modern mathematical algorithms, Model Order Reduction (MOR) methods, and so on.…”
Section: Distributed Maximum Power Point Tracking Convertermentioning
confidence: 99%
“…In fact, the reliability R(t) is defined in [9] as the probability that an item, in our case the PV plant, performs the required function, without a failure under stated conditions for a stated period of time. From the definition, it is evident that maintaining the reliability is an essential need in modern systems, especially in continuously changing working conditions of systems [10][11][12][13][14][15][16][17][18][19][20][21], such as the PV ones. In detail, the reliability engineering of an electronic and mechanical equipment requires a means for a quantitative baseline, or a reliability prediction analysis.…”
Section: Power Optimizers Reliability Assessmentmentioning
confidence: 99%
“…A real-time test system is the perfect solution in many application areas [12,13]. In this paper, a real-time multi-domain signal analysis architecture for broadband communication is first introduced, which seamlessly stores the downconverted baseband complex signal in a memory and performs simultaneously real-time spectrum analysis, modulation analysis, power measurements, timing measurements as well as statistical analysis.…”
Section: Introductionmentioning
confidence: 99%