Solving the no-wait job shop scheduling problem with due date constraints: A problem transformation approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 18 publications
(3 citation statements)
references
References 46 publications
0
3
0
Order By: Relevance
“…In this study, it is assumed that there are setup times for machines and transfer times between them. Samarghandi (12) researched a no-wait JSP focused on minimizing the makespan while factoring in job due dates. His approach involved transforming the original problem into a related one (CP) and creating models for both.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In this study, it is assumed that there are setup times for machines and transfer times between them. Samarghandi (12) researched a no-wait JSP focused on minimizing the makespan while factoring in job due dates. His approach involved transforming the original problem into a related one (CP) and creating models for both.…”
Section: Literature Reviewmentioning
confidence: 99%
“…(2018), Ying and Lin (2018), Fatih Tasgetiren et al. (2019), Samarghandi (2019b), Cheng et al. (2019), Deng et al.…”
Section: An Overview Of Shop Scheduling Problems Characteristicsmentioning
confidence: 99%
“…Given the importance of scheduling in the design of decision support systems [4], case-specific formulations, and effective solution algorithms are of high significance to help modernize the production systems. Recent studies developed state-of-the-art solution approaches [5][6][7][8][9] to facilitate the industry-scale application of the NWSPs, which are rather complex. Many other studies extended the NWSP, for example through including setup times [10], machine maintenance [11], no-idle-time situation [12], and distributed production environment [13], among the other examples (see [14]), to address case-specific industrial needs.…”
Section: Introductionmentioning
confidence: 99%