Day 3 Wed, September 30, 2015 2015
DOI: 10.2118/174838-ms
|View full text |Cite
|
Sign up to set email alerts
|

Solving Pre-Salt Underream While Drilling Challenge: Dynamic Simulations Optimize BHA/Cutter Block Configuration Offshore Brazil

Abstract: Challenges while drilling pre-salt wells offshore Brazil have led to planed hole enlargement operations as part of the drilling solution of this type of imviroments in vertical sections from 18-1/8Љ x 22-in. However, this application proved to be challenging for the hydraulic underreamer cutting structures as high vibration levels together with increased cutter block matrix exposure to the formation led to premature wear on the hydraulic hole enlarger cutter blocks.Formation to be enlarged is composed of 40% d… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
references
References 5 publications
0
0
0
Order By: Relevance