2023
DOI: 10.3390/math11092099
|View full text |Cite
|
Sign up to set email alerts
|

Solving a Production Lot-Sizing and Scheduling Problem from an Enhanced Inventory Management Perspective

Abstract: In this study, we consider a production lot-sizing and scheduling problem found in the fruit juice production industry from an enhanced inventory management perspective. The problem can be classified as a P2SMM (two-stage multi-machine lot-scheduling) problem. We extended the classical P2SMM problem by incorporating an additional inventory management aspect of finished products to reflect a possible real-life case problem, specifically regarding the shelf-life concept and limited warehouse capacity, with a pos… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 49 publications
(50 reference statements)
0
1
0
Order By: Relevance
“…Additionally, models for "yield uncertainty" [19], stochastic [20,21], uncertain [22], and non-stationary demand with heuristic solving methods [17] have been presented. The problem exists and has been tried to be solved even for the production phase [23]. These findings offer valuable guidance for practitioners seeking to optimize production planning processes in the face of uncertain yields and demands.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Additionally, models for "yield uncertainty" [19], stochastic [20,21], uncertain [22], and non-stationary demand with heuristic solving methods [17] have been presented. The problem exists and has been tried to be solved even for the production phase [23]. These findings offer valuable guidance for practitioners seeking to optimize production planning processes in the face of uncertain yields and demands.…”
Section: Literature Reviewmentioning
confidence: 99%