2021
DOI: 10.1002/cjce.23955
|View full text |Cite
|
Sign up to set email alerts
|

Solutions selection based on the P‐graph integrated data envelopment analysis for material scheduling in the ethylene production

Abstract: Material scheduling is significant in the ethylene production process. However, factors such as the production scale and the technology also affect the choice of material scheduling solutions. Therefore, this paper proposes a novel P-graph methodology integrated data envelopment analysis (DEA) for the solutions selection of material scheduling. First, based on the basic procedure, a scheduling superstructure model expanding from the time dimension is built. With the cost as the objective function, the optimal … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 37 publications
0
1
0
Order By: Relevance
“…At present, alarm configuration is less studied. First, with the increasing plant scale and complexity, hundreds of process variables could be monitored. Second, advanced modern control systems, such as the distributed control system, have simplified the configuration of process variables with alarm variables, such as one-touch software.…”
Section: Introductionmentioning
confidence: 99%
“…At present, alarm configuration is less studied. First, with the increasing plant scale and complexity, hundreds of process variables could be monitored. Second, advanced modern control systems, such as the distributed control system, have simplified the configuration of process variables with alarm variables, such as one-touch software.…”
Section: Introductionmentioning
confidence: 99%