Solar steam reforming of natural gas integrated with a gas turbine power plant: Economic assessment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
5
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 20 publications
(5 citation statements)
references
References 37 publications
(47 reference statements)
0
5
0
Order By: Relevance
“…An alternative STIG configuration uses solar thermal heat to power a methane steam reforming reaction to produce an upgraded stream of syngas (with H 2 and CO as the desired products). The syngas stream, however, still contains unreacted steam which is then introduced into the gas turbine (with added methane), qualifying as a STIG cycle [82,83]. This configuration is shown in Figure 11 and is discussed further in the Solar Methane Steam Reforming section.…”
Section: Steam Injection Gas Turbines With Solarmentioning
confidence: 99%
See 1 more Smart Citation
“…An alternative STIG configuration uses solar thermal heat to power a methane steam reforming reaction to produce an upgraded stream of syngas (with H 2 and CO as the desired products). The syngas stream, however, still contains unreacted steam which is then introduced into the gas turbine (with added methane), qualifying as a STIG cycle [82,83]. This configuration is shown in Figure 11 and is discussed further in the Solar Methane Steam Reforming section.…”
Section: Steam Injection Gas Turbines With Solarmentioning
confidence: 99%
“…Bianchini et al proposed a natural gas / CSP hybrid where a parabolic trough collector field is used to provide heat for the MSR reaction to produce syngas. This solar-upgraded gas stream is then combusted in a gas turbine (see Figure 11 for a simplified process schematic, available from [82]). One of the key design and operational concerns with this configuration is the reaction temperature of the MSR reactor, which has a dramatic impact on the MSR reactor efficiency.…”
Section: $ + and ()) + ℎ ⇌ +mentioning
confidence: 99%
“…Economic indicators are developed as vital tools for evaluating an investment in a project. Payback period [11][12][13] and net present value (NPV) [14,15] have been used as comprehensive economic indicators to analyze the feasibility of the investment. The payback period is the time length counted from the start-up of the investment up to the point of time when all costs are recovered.…”
Section: Introductionmentioning
confidence: 99%
“…,10,11,17,21-24,26-33,35,37,39-41,43-55,57-63,65-70,72-75,77- 84,86-89,92-97,99,101-108,110,111,113-116,118,120-134,136-151, 153,154,157-159,161,164-181,183-187,189-199,201-203,205,206,208, 211-215,217,218,220-230,232-235] Financing conditions[10,11,19,21,23,28-32,34,38,40,41,43,44,47,50,51,53,55,59,64,65,67-69, 76-78,82,85-90,94,96,98,100,101,103-105,113,115,116,121-123,125-127,133,134,136-141,143,145-147,154,162,164,166,167,170,173,174, 178-181,185,189,192,194,196-198,201-203,206,209-211,213,215,219, 226,228,233] 98 Discount rate [4,10,19,21-23,25,26,28-30,33-35,37,38,40,41,43,46-51,53,57,59,60, 63-70,73,76-78,80,83,85-90,93,97-99,103,105-108,110,111,114-120, ,10,11,21,23-25,29-31,40,41,43,47,50,53,56-59,61,63,64,67,72-74, 76-81,83-88,91,92,94,97,101,103,105,107,111,114,115,119,121-126, 130-134,136-143,[145][146][147][148][149][150][152][153][154][156][157][158]162,[164][165][166][167][168][169][170][171][172][173][174][175][176][177][178][179][180]183,185,186,[189][190][191][192]194,…”