2016
DOI: 10.1007/s12665-016-5577-6
|View full text |Cite
|
Sign up to set email alerts
|

Soil and water conservation in mining area based on ground surface subsidence control: development of a high-water swelling material and its application in backfilling mining

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

2
26
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 28 publications
(28 citation statements)
references
References 34 publications
2
26
0
Order By: Relevance
“…Properties of these seven materials, including the strength and the elastic modulus, were estimated. The specimens were cast by pouring the mixed paste filling-material into a standard specimen mold (ϕ50 mm × 100 mm) for adequate compaction until they became solid for UCS tests [30]. As shown in Figure 8, in the first 7 days, the strength of the sample showed a rapid increase with the growth of the solidification time, while the increase rate of the strength revealed significant decrease from the time period that specimens had been cured from 7 days to 14 days.…”
Section: Parameters Of Filling Materialsmentioning
confidence: 99%
See 2 more Smart Citations
“…Properties of these seven materials, including the strength and the elastic modulus, were estimated. The specimens were cast by pouring the mixed paste filling-material into a standard specimen mold (ϕ50 mm × 100 mm) for adequate compaction until they became solid for UCS tests [30]. As shown in Figure 8, in the first 7 days, the strength of the sample showed a rapid increase with the growth of the solidification time, while the increase rate of the strength revealed significant decrease from the time period that specimens had been cured from 7 days to 14 days.…”
Section: Parameters Of Filling Materialsmentioning
confidence: 99%
“…Table 2. Geological and mining parameters to calculate roof sinking amount in CECB [27,30]. According to the Equations (15) and (17) as well as the parameters listed in the Tables 1 and 2, the maximum loads on the coal pillars and the filling bodies could be estimated.…”
Section: Parameters Of Filling Materialsmentioning
confidence: 99%
See 1 more Smart Citation
“…These two mixed grouts (the water content of grout B can exceed 95%) are solidified after half an hour and reach final strength after 60 days. Meanwhile, many field tests proved that surface subsidence can be effectively controlled [36]. Based on the geological conditions and analysis above, the critical problem for successful implementation is finding the optimal design for the layout and support of the roadway, the roadway backfill mining system, and the filling rate.…”
Section: Design Of the Technical Parametersmentioning
confidence: 99%
“…However, these materials have many shortcomings such as a complicated filling process, high investment cost, and poor effect of filling goaf. Until the 1980s, high-water materials (HWMs) were widely used in mine filling, which resolved the problems associated with traditional filling materials [6][7][8]. For example, Chen's research [9] showed that backfill satisfies the strength requirements and effectively controls the surface subsidence.…”
Section: Introductionmentioning
confidence: 99%