2016
DOI: 10.1016/j.proeng.2016.11.837
|View full text |Cite
|
Sign up to set email alerts
|

Software Product Development for the Construction Equipment Selection

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…[14,15]. Nonetheless, given the complicated financial circumstances and the project's total failure, this selection problem necessitates locating and selecting the best version [16]. Unavailability of replacement parts for imported equipment [17]; disposal of equipment for potential projects affecting the economy, lack of service support for imported equipment, unsuitable climatic conditions for certain equipment, and lack of a prior record of equipment verification were all issues related to inappropriate on-site equipment [18,19].…”
Section: Improper Equipment Selectionmentioning
confidence: 99%
“…[14,15]. Nonetheless, given the complicated financial circumstances and the project's total failure, this selection problem necessitates locating and selecting the best version [16]. Unavailability of replacement parts for imported equipment [17]; disposal of equipment for potential projects affecting the economy, lack of service support for imported equipment, unsuitable climatic conditions for certain equipment, and lack of a prior record of equipment verification were all issues related to inappropriate on-site equipment [18,19].…”
Section: Improper Equipment Selectionmentioning
confidence: 99%
“…Construction machinery is one of the most important criteria for assessing the level of the construction organization technical equipment, since modern construction industry uses a large variety and number of labor saving devices [7][8][9][10][11][12][13][14][15][16][17][18].…”
Section: Introductionmentioning
confidence: 99%
“…The management mechanisms used and proposed today do not provide the desired result in the assessment of the level of construction works mechanization [17]. Therefore, the development of methods for assessing the overall technical facilities of a construction organization claiming to win a contract for a high-rise building is one of the key tasks to solve the problems associated with the construction of skyscrapers.…”
Section: Introductionmentioning
confidence: 99%