2008
DOI: 10.1016/j.eswa.2006.10.040
|View full text |Cite
|
Sign up to set email alerts
|

Software maintenance project delays prediction using Bayesian Networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

1
25
0
2

Year Published

2008
2008
2017
2017

Publication Types

Select...
6
3
1

Relationship

0
10

Authors

Journals

citations
Cited by 63 publications
(28 citation statements)
references
References 17 publications
1
25
0
2
Order By: Relevance
“…In the second case, mistakes can appear due to noise, discretization methods or database errors. The use of Bayesian networks in software engineering is not new [26,27,46,13], for example they have been applied to maintenance [13], defect prediction [26] and the implementation of a software project [46].…”
Section: Bayesian Network and Requirements Engineeringmentioning
confidence: 99%
“…In the second case, mistakes can appear due to noise, discretization methods or database errors. The use of Bayesian networks in software engineering is not new [26,27,46,13], for example they have been applied to maintenance [13], defect prediction [26] and the implementation of a software project [46].…”
Section: Bayesian Network and Requirements Engineeringmentioning
confidence: 99%
“…The Bayesian estimation method combines subjective experience and real data to estimate attribute values using statistical methods (Cho, 2006;de Melo & Sanchez, 2008). Suppose the probability density function for the random variable x is f(x), and this function has an unknown attribute h. Also suppose a subjective judgment probability density function h(h) is used to express the value of the random variable h. Given a set of random samples x 1 , .…”
Section: Bayesian Estimationmentioning
confidence: 99%
“…Representation of Bayesian Network comprises two parts [9]: (a). The qualitative part of Bayesian Networks is a graphical description of variables the showing distribution and the relationship.…”
Section: Bayesian Networkmentioning
confidence: 99%