2011
DOI: 10.1049/iet-sen.2010.0027
|View full text |Cite
|
Sign up to set email alerts
|

Software cost estimation for component-based fourth-generation-language software applications

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
13
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 18 publications
(13 citation statements)
references
References 5 publications
0
13
0
Order By: Relevance
“…In code development, the widespread use of cost estimation in budgeting and project planning has resulted in the development of several estimation techniques (Zia et al, 2011;Magazinius et al, 2012;Jørgensen and Shepperd, 2007;Leung and Fan, 2002). A common approach used in cost estimation, particularly in software engineering, involves the determination of the effort (usually in person-months), the duration of the project (in time), and the cost (in dollars or other currency) (Leung and Fan, 2002;Zia et al, 2011).…”
Section: Cost Analysismentioning
confidence: 98%
“…In code development, the widespread use of cost estimation in budgeting and project planning has resulted in the development of several estimation techniques (Zia et al, 2011;Magazinius et al, 2012;Jørgensen and Shepperd, 2007;Leung and Fan, 2002). A common approach used in cost estimation, particularly in software engineering, involves the determination of the effort (usually in person-months), the duration of the project (in time), and the cost (in dollars or other currency) (Leung and Fan, 2002;Zia et al, 2011).…”
Section: Cost Analysismentioning
confidence: 98%
“…When the client is not clear on the complete requirements, it is not possible to estimate the project correctly in term of efforts and time. Studies and development teams have been attempting to simplify effort estimation methods [7]. One main pitfall has been the reduced applicability of proposed estimations methods, where technological growth has induced indirections in effort estimations.…”
Section: Fig 1 -Conceptual Agile Developmentmentioning
confidence: 99%
“…Not only in embedded system and design, similar problems do exists in fourth generation language. The degree of complexity towards fourth generation language is quite higher and this problem is investigated by Zia et al [30]. The technique has used empirical data on the basis of the standard specification of COCOMO II model.…”
Section: General Cost Estimation Techniquesmentioning
confidence: 99%