“…In addition, normally open tie-switches (TS), normally closed sectionalize switches, concerned conductor replacements, and substation capacity enhancements are considered in asset optimization in DN. Furthermore, reconfiguration of a network to modified radial or to an interconnected topology has also been considered as a key component in the asset optimization of DN, from the viewpoint of DNPP [15,16].In all of the above-mentioned works [6][7][8][9][10][11][12][13][14][15][16], the assets mostly used are DG, reactive power compensating devices, grid reinforcement with associated devices, and change of DN topology. The most significant asset optimization approaches aiming at optimal sitting and sizing under system Energies 2020, 13, 1444 3 of 71 constraints include classical techniques like analytical, deterministic, numerical, and exhaustive search.…”