2019 20th International Scientific Conference on Electric Power Engineering (EPE) 2019
DOI: 10.1109/epe.2019.8777948
|View full text |Cite
|
Sign up to set email alerts
|

Small Hydro Power Plants Operating As Backup Source In Local Island

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2
2

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 1 publication
0
5
0
Order By: Relevance
“…The main task of the correlation-regression analysis is to define and assess the most significant quantitative characteristics of particular relations between particular processes and phenomena. The Pearson, Spearman, and Kendall correlation coefficients are to be used for estimating this influence [37].…”
Section: Investigation Of Daily Electricity Generation Ress During Th...mentioning
confidence: 99%
See 2 more Smart Citations
“…The main task of the correlation-regression analysis is to define and assess the most significant quantitative characteristics of particular relations between particular processes and phenomena. The Pearson, Spearman, and Kendall correlation coefficients are to be used for estimating this influence [37].…”
Section: Investigation Of Daily Electricity Generation Ress During Th...mentioning
confidence: 99%
“…), then the Pearson correlation coefficient does not properly reflect the relationships between variables. Checking the normality of the data distribution and analysis of the scattergram allowed us to conclude that other criteria could be applied, such as Spearman's rank coefficient [32,37].…”
Section: Correlation-regression Analysis Of Res Generationmentioning
confidence: 99%
See 1 more Smart Citation
“…In this case, the total cost of C ∑ to compensate for the unevenness of the RES generation schedule by power redundancy is minimized. The task of optimizing the cost of redundancy is set as [12,13]:…”
Section: The Power Balance In the Power System Taking Into Account Re...mentioning
confidence: 99%
“…In addition, "Ukrenergo" from June 2022 began to pay RES producers located out of the occupied territories and generating electricity in Ukraine (made only 21% of what was required). The implementation of RES in power grids, such as photovoltaic and wind power plants, can influence power balance [6][7][8].…”
Section: Introductionmentioning
confidence: 99%