2015
DOI: 10.1080/07900627.2015.1058766
|View full text |Cite
|
Sign up to set email alerts
|

Sleeping with the enemy? Capturing internal risks in the logical framework of a water management project

Abstract: Logframes are fundamental to contemporary development. However, there are ongoing debates about their efficacy. This paper pinpoints the limitations of the logframe approach in a water project in Central Asia. Issues surrounding logframes are identified. These include addressing internal risks; the use of baseline studies for the accuracy of assumptions; the ability to adapt under an inflexible budget; and linking the logframe and contract. Findings show that rigid planning may constrain effective project impl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
10
0
12

Year Published

2017
2017
2022
2022

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(25 citation statements)
references
References 22 publications
(26 reference statements)
1
10
0
12
Order By: Relevance
“…Yamaswari et al [48] report a similar experience with a water management project conducted from 2001 to 2012 in the Ferghana Valley. The project's goal was to establish long-term transboundary water cooperation between the riparian states in order to improve water management in the Syr Darja basin.…”
Section: The Transitional Periodmentioning
confidence: 80%
See 2 more Smart Citations
“…Yamaswari et al [48] report a similar experience with a water management project conducted from 2001 to 2012 in the Ferghana Valley. The project's goal was to establish long-term transboundary water cooperation between the riparian states in order to improve water management in the Syr Darja basin.…”
Section: The Transitional Periodmentioning
confidence: 80%
“…Time-consuming discussions and contestations over the parties' purposes and needs are characteristic of this process, but what is more striking is that the ultimate agreement that "emerges from these layers of contestation appears to stand only the smallest of chances of providing meaningful guidance to those who would somehow 'manage' nature" [34]. Yamaswari et al [48] are, thus, probably right in pointing out that delays in this adjustment process translate into project rigidity in the planning and implementation phases.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Aunque no hay una opinión consensuada entre la literatura sobre cómo debería realizarse la dirección de los PCD, son muchos los autores que defienden que las herramientas de dirección de proyectos, principalmente las relacionadas con la gestión de riesgos, de costes y de grupos de interés (Yamaswari et al, 2016), ayudarían, y se podrían seguir ciertos estándares como los definidos en el PMBoK, pero adaptándolos al contexto de cada proyecto (Flyvjberg, 2005;Grisham, 2010;Khang y Moe, 2008;Wirick, 2009). Estudios, como el de Golini, Kalchschmidt y Landoni (2015), en el seno de las ONGDs, demuestran que el uso de las herramientas de la DP está relacionado con el éxito y el impacto del proyecto en el largo plazo.…”
Section: La Dirección De Proyectos En La Cooperación Al Desarrollounclassified
“…Algunos autores han tratado de analizar el estado de la DP en los PCD también a través del estudio de los proyectos financiados por bancos de desarrollo o agencias internacionales (Ahsan y Gunawan, 2010;Ika, Diallo y Thuillier, 2012), o a través de la evolución de las propias agencias de cooperación (Landoni y Corti, 2011). Y son muchos, los que analizan la dirección de los PCD a través de una de las herramientas más utilizadas en cooperación al desarrollo, el marco lógico (Crawford y Bryce, 2003;Ika y Lytvynov, 2011;Landoni y Corti, 2011;McEvoy et al, 2016;Yamaswari et al, 2016). Esta herramienta será analizada en detalle en el Capítulo 3.…”
Section: La Dirección De Proyectos En La Cooperación Al Desarrollounclassified