2013
DOI: 10.4028/www.scientific.net/amm.405-408.3108
|View full text |Cite
|
Sign up to set email alerts
|

Site Measurement of Modularized Low-Position Hydraulic Jacking Formwork System

Abstract: Jacking formwork system has been widely used in the construction of tall buildings and modularized low-position jacking steel platform formwork system is made up of several assembled and turnover subsystems, including steel truss platform system, steel columns supporting system, formwork and rack system, two-way-acting hydraulic jack and its control system.The paper described the application of the system in Fuzhou Yu Yang Central Golden Plaza Project and construction site monitoring were conducted. According … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…Based on the Fuzhou Yuyang Central Jinzuo Project, Zhou modeled and numerically analyzed the key systems of the jacking steel truss and carried out on-site monitoring of the steel truss to ensure safe operation during jacking and construction. According to the monitoring results, some suggestions were proposed to ensure construction safety [13]. Gao et al, monitored the deformation of a super high-rise building using vibrating wire strain gauges during the construction of 10 to 48 floors and compared the monitoring results with the numerical analysis results.…”
Section: Introductionmentioning
confidence: 99%
“…Based on the Fuzhou Yuyang Central Jinzuo Project, Zhou modeled and numerically analyzed the key systems of the jacking steel truss and carried out on-site monitoring of the steel truss to ensure safe operation during jacking and construction. According to the monitoring results, some suggestions were proposed to ensure construction safety [13]. Gao et al, monitored the deformation of a super high-rise building using vibrating wire strain gauges during the construction of 10 to 48 floors and compared the monitoring results with the numerical analysis results.…”
Section: Introductionmentioning
confidence: 99%