1987
DOI: 10.2737/pnw-gtr-205
|View full text |Cite
|
Sign up to set email alerts
|

SIMYAR: a cable-yarding simulation model.

Abstract: A skyline-logging simulation model designed to help planners evaluate potential yarding options and alternative harvest plans is presented. The model, called SIMYAR, uses information about the timber stand, yarding equipment, and unit geometry to estimate yarding co stand productivity for a particular operation. The costs of felling, bucking, loading, and hauling are not considered. Included are a description of the input requirements for SIMYAR, descriptions of the major algorithms, suggested applications, an… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1988
1988
1988
1988

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Other programs in PLANS help planners design highlead yarding units (HIGHLEAD; Twito and others 1987b),lay out preliminary transportation systems (ROUTES; Reutebuch in press), estimate cable-yarding cost and production (SIMYAR; McGaughey and Twito 1987), visualize topography (VISUAL and SLOPE;McGaughey and Twito 1988), and develop DTMs from topographic maps (MAP; Twito and others 1987a).…”
Section: Introduction the Preliminary Logging Analysis System Using Dtmsmentioning
confidence: 99%
“…Other programs in PLANS help planners design highlead yarding units (HIGHLEAD; Twito and others 1987b),lay out preliminary transportation systems (ROUTES; Reutebuch in press), estimate cable-yarding cost and production (SIMYAR; McGaughey and Twito 1987), visualize topography (VISUAL and SLOPE;McGaughey and Twito 1988), and develop DTMs from topographic maps (MAP; Twito and others 1987a).…”
Section: Introduction the Preliminary Logging Analysis System Using Dtmsmentioning
confidence: 99%