2022
DOI: 10.1021/acs.iecr.1c03863
|View full text |Cite
|
Sign up to set email alerts
|

Simultaneous Production and Maintenance Scheduling for Refinery Front-End Process with Considerations of Risk Management and Resource Availability

Abstract: Effective unit maintenance is critically important for the front-end crude transfer process (FCTP) to ensure production reliability and safe operations in refineries. It should be prioritized based on risk ratings of all maintenance tasks and constrained by the availability of various maintenance resources, such as budget, manpower, equipment, and supplies, as well as having minimal impact on the normal production of refineries. In this paper, a new methodology for the simultaneous production and maintenance s… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 31 publications
0
1
0
Order By: Relevance
“…Indeed, productionmaintenance scheduling has been widely studied in the literature. See for instance the works of (Ghaleb et al, 2020;Palacín et al, 2018;Wang et al, 2022). Nevertheless, in those works the scheduling problems are not solved in real time, or the formulation is approximated to get a linear optimization problem.…”
Section: Fouling Effectmentioning
confidence: 99%
“…Indeed, productionmaintenance scheduling has been widely studied in the literature. See for instance the works of (Ghaleb et al, 2020;Palacín et al, 2018;Wang et al, 2022). Nevertheless, in those works the scheduling problems are not solved in real time, or the formulation is approximated to get a linear optimization problem.…”
Section: Fouling Effectmentioning
confidence: 99%