Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems

Abstract: AbstratThis paper presents a method to find the optimal production, repair/replacement and preventive maintenance policies for a degraded manufacturing system. The system is subject to random machine failures and repairs. The status of the system is considered to degrade with repair activities. When a failure occurs, the machine is either repaired or replaced. A replacement action renews the machine while a repair action brings it to a degraded operational state for which the next repair time increases as the … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
17
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 68 publications
(18 citation statements)
references
References 27 publications
0
17
0
Order By: Relevance
“…The Kushner's technique is useful because it converts the continuous minimization problem to a discrete-time, discrete-state decision process, for further details about this technique Dehayem-Nodem et al [21] can be consulted. Without loss of generality, we study the case of a manufacturing system with three defective rates depending on its productivity.…”
Section: Optimization Methods Descriptionmentioning
confidence: 99%
“…The Kushner's technique is useful because it converts the continuous minimization problem to a discrete-time, discrete-state decision process, for further details about this technique Dehayem-Nodem et al [21] can be consulted. Without loss of generality, we study the case of a manufacturing system with three defective rates depending on its productivity.…”
Section: Optimization Methods Descriptionmentioning
confidence: 99%
“…Ribeiro et al [17] proposed a mixed integer linear programming model to jointly optimise the maintenance strategy and the buffer size. Dehayem Nodem et al [6] simultaneously optimised the production and maintenance of a system with a production unit and a buffer-inventory. Murino et al [16] applied three thresholds (i.e.…”
Section: Science and Technologymentioning
confidence: 99%
“…To solve the HJB equations, we used a numerical method based on the Kushner (1992) approach, such as in Gharbi et al (2011). By approximating ( , ) …”
Section: Appendix Numerical Approachmentioning
confidence: 99%
“…This basic result has been extended in several ways over the years, with most such extensions relating to the Markovian case (see Tan and Gershwin (2004), Dong-Ping (2009), etc.). Only a few papers have examined semi-Markov processes (see Hu and Xiang (1995); Dehayem et al (2011); Kazaz and Sloan (2013) etc.). In the Markovian case, however, a frequent assumption is that the underlying Markov process is homogeneous.…”
Section: Introductionmentioning
confidence: 99%