2010
DOI: 10.1016/j.endm.2010.05.009
|View full text |Cite
|
Sign up to set email alerts
|

Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0
2

Year Published

2011
2011
2017
2017

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(6 citation statements)
references
References 1 publication
0
4
0
2
Order By: Relevance
“…CP effectiveness when addressing scheduling problems have been proved by many contributions in different domains, such as manufacturing scheduling [22], train scheduling [23], batch plant scheduling [20] and [24], staff scheduling [25], assembly lines scheduling [26], etc. However, future research in CP requires being oriented towards its integration within other technologies, as part of enterprise service-oriented framework.…”
Section: The Cp Scheduling Systemmentioning
confidence: 99%
“…CP effectiveness when addressing scheduling problems have been proved by many contributions in different domains, such as manufacturing scheduling [22], train scheduling [23], batch plant scheduling [20] and [24], staff scheduling [25], assembly lines scheduling [26], etc. However, future research in CP requires being oriented towards its integration within other technologies, as part of enterprise service-oriented framework.…”
Section: The Cp Scheduling Systemmentioning
confidence: 99%
“…. , Nm j (11) Verilen amaç fonksiyonu altında kısıt (2), atama kısıtıdır ve her bir görevin sadece bir istasyona atanmasını sağlar. Diğer bir deyişle, bir görev bir istasyon içerisindeki yalnızca bir pozisyona atanabilir.…”
Section: Amaç Fonksiyonuunclassified
“…Finally, multi-model lines were also considered in [91], [92]. In this case setup times depend on both the sequence of operations assigned to each workstation and the sequence of models processed by the line.…”
Section: B Various Setup Between Successive Tasksmentioning
confidence: 99%