2016
DOI: 10.1016/j.proeng.2016.01.063
|View full text |Cite
|
Sign up to set email alerts
|

Simulation of the Transport Centre Process by Using Special Tools

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(7 citation statements)
references
References 0 publications
0
7
0
Order By: Relevance
“…An analysis of the activities of nine building organizations engaged in frame-monolithic and prefabricated-block construction, which are characterized by a variety of relationships between participating organizations, suggesting a complex coordination of the activities of the participants in the technological process shows the following: As the analysis data show, the main problem in the implementation of logistics and production tasks remains the inconsistency of the actions of the participants in the processthe main percentage of delays is associated precisely with the backlog of technological procedures and the lack of timely adjustments to the delivery schedule [1][2][3]. Management of investment and construction activities at all stages of construction is considered as a process-based activity -a structured network of processes that "consume" resources and make products.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…An analysis of the activities of nine building organizations engaged in frame-monolithic and prefabricated-block construction, which are characterized by a variety of relationships between participating organizations, suggesting a complex coordination of the activities of the participants in the technological process shows the following: As the analysis data show, the main problem in the implementation of logistics and production tasks remains the inconsistency of the actions of the participants in the processthe main percentage of delays is associated precisely with the backlog of technological procedures and the lack of timely adjustments to the delivery schedule [1][2][3]. Management of investment and construction activities at all stages of construction is considered as a process-based activity -a structured network of processes that "consume" resources and make products.…”
Section: Methodsmentioning
confidence: 99%
“…In this sense, technological platforms resemble the reproduction of the idea of scientific and production associations, which were created in the Soviet economy to implement a single cycle "science-technology-production-application", expanded to the scale of an industry and an intersectoral organization. In the current conditions, there is a shift towards the formation of state corporations, public-private partnerships, focused on the implementation of scientific and technical programs of a national character [1].…”
Section: Introductionmentioning
confidence: 99%
“…waiting for HDV, changing of the train crew, instructions, infrastructure restrictions, accidents, unfavourable weather conditions etc. On the basis of a correct and unambiguous definition of the reason it will be possible, or not necessary to determine the charge payer for parking of vehicles [11][12].…”
Section: Reason For Stabling the Rolling Stockmentioning
confidence: 99%
“…The satisfaction of these requirements depends on their composition and manufacturing technology as well as on their resistance to short-term or long-term impacts of the environment. The art of a civil engineer is to combine the requirements imposed on structures with the capabilities of certain building materials at minimal monetary costs for the construction of the object and to obtain the decent quality of the final construction products [1].…”
Section: Introductionmentioning
confidence: 99%